AIC ENGINEERING GMBH
  • Home
  • About Us
  • Projects
  • Contact Us

  • https://www.linkedin.com/in/alfred-schulter-a9214139 LinkedIn
  • https://www.linkedin.com/in/siavash-mafi-3a398a26 Linkedin
  • https://www.linkedin.com/in/juan-manuel-davila-mendez-2628a6a4 Linkedin
  • http://www.aic-engineering.at/feed/ RSS
  • DJI_0027
    T4 water transfer tunnel
    Kermanshah - Iran
    This project is located in West of Iran, the Kermanshah province. 4300 meters long water transfer tunnel was excavated by mechanized method (EPB TBM). Typical width of this tunnel is 6 meters.
    View Project
  • 9L8A1673
    Bazideraz water transfer tunnel
    Kermanshah - Iran
    This project is located in West of Iran, the Kermanshah province. 8551 meters long water transfer tunnel was excavated by mechanized method (EPB TBM). Typical width of this tunnel is 6 meters.
    View Project

Projects

Home / Projects
T4 water transfer tunnel
T4 water transfer tunnel
T4 water transfer tunnel
T4 water transfer tunnel
T4 water transfer tunnel
Tunnels20190105091013
Bazideraz water transfer tunnel
Bazideraz water transfer tunnel
Bazideraz water transfer tunnel
Bazideraz water transfer tunnel
Tunnels20190105081352
AIC ENGINEERING GMBH © 2016 | All Rights Reserved
  • https://www.linkedin.com/in/alfred-schulter-a9214139
  • https://www.linkedin.com/in/siavash-mafi-3a398a26
  • https://www.linkedin.com/in/juan-manuel-davila-mendez-2628a6a4
  • http://www.aic-engineering.at/feed/